Rapid progress was being made yesterday on Mangligot house. Already the front and one side wall was either completed and drying or having concrete poured. After the showers of the past couple of days the weather for a change was dry, warm and even a little humid. Inside the shell an electrician was preparing the connections for the main breaker board. The remaining walls were being pre-frabricated with their network of steel rods prior to encasing in the formers and concrete pouring.